Prattville Finance Explorer · FY27 Final · Finance Director Corrections
Finance · Prattville Finance Explorer FY27 final budget and City finance information presented in plain language
Final FY27 Finance baseline · September 8, 2026. Interfund transfers are movement of the same City dollars between funds and are not counted again as additional revenue. Education content remains unchanged pending its separate validated package.

Prattville Finance Explorer

Start with the big picture: where the General Fund money comes from, what must be funded first, and why not every City dollar is available for every purpose.

How to read the colors Money In / Revenue Balance / Existing Funds Money Out / budgeted spending Restricted / Committed Pending / Needs Validation

Some of the Largest FY27 General Fund Revenue Sources

The General Fund is the City's main operating account. These major revenue sources flow into it. This does not include separate enterprise, special revenue, debt service or capital-project funds.
Base Sales Tax
$23.00M
Business Licenses
$8.14M
Restaurant Sales Tax
$6.05M
Ad Valorem · Autauga
$4.60M
Simplified Seller / Use Tax
$4.20M
Lodging Tax · Autauga
$3.69M
Important: “Sales Tax” is not a single revenue line. The final FY27 budget contains multiple sales and use tax accounts; $23.00M is the base sales-tax line, not all City sales/use tax revenue.
↓ selected major revenue lines within the General Fund ↓
FY27 Final General Fund Revenue
$65.70M
The City's primary operating fund — not the entire City budget.
Money In / Current-Year Revenue
$65.70M
FY27 Final General Fund revenue
Money Out / budgeted spending
$70.84M
FY27 final General Fund budgeted spending
budgeted spending Above Revenue
$5.14M
This is the difference between current-year General Fund revenue and budgeted expenditures. It is not a simple operating deficit; the budget includes transfers, reserves and other financing activity.

FY26 Reality Check — What Was Actually Happening Through July?

The adopted budget tells us what Council authorized. The City's June 2026 unaudited reports add a second lens: how revenue and spending were actually tracking during FY26.
General Fund Revenue YTD
$47.261M
of $61.724M budgeted · 76.57%
About 3.02% ahead of the same FY25 YTD point.
General Fund Expenditures YTD
$51.538M
of $66.371M budgeted · 77.65%
June expenditure report: 75% of fiscal year complete.
Do not subtract these two YTD figures and call the difference a deficit. Revenue recognition, transfers, capital activity and expenditure timing do not occur evenly through the year. Source: City of Prattville June 2026 unaudited revenue and expenditure reports.
AUGUST 2026 ACTUAL TAX COLLECTIONS

One month of actual performance, kept separate from the FY27 budget

ACTUAL · NOT ANNUALIZED
Net tax revenue $4,002,211.68 August 2026 actual
August 2025 comparison $3,733,424.91 Same-month comparison
Year-over-year growth 7.20% +$268,786.77
Sales-tax increase generated $826,169.02 Actual August money movement
See the August sales-tax increase distribution
General Fund Reserves · 10% $82,616.90
Board of Education $63,344.40
Education Reserves · One-Cent $92,944.01
Infrastructure Reserves · One-Cent $185,888.03
Parks & Recreation Reserves · One-Cent $185,888.03
Public Facilities Reserves · One-Cent $185,888.03
How to read this: These are actual August 2026 distributions from the tax report. They are not an annual projection and are not presented as a complete permanent allocation formula. The report also confirms that education-related money continued to flow to the Board of Education outside the General Fund ACBOE appropriation line.
Adjusted comparison excluding the sales-tax increase: $3,190,479.77 in Aug. 2026 vs. $2,967,455.75 in Aug. 2025, an increase of $223,024.02 (7.52%).

Important: having money in the City budget does not mean every dollar is “up for grabs.”

Before Council can treat a dollar as available for a new priority, we have to know which fund it is in, whether it is restricted or already committed, and whether it is needed to operate core City services.

CORE SERVICES & OPERATIONS
$40.281M

Payroll & related costs support the people who provide City services — Police, Fire, Public Works, Parks, Courts, administration and more. These costs are largely embedded inside department budgets, not added on top of them.

GENERAL FUND TRANSFERS
$12.274M

Transfers are dollars moved from the General Fund to another City fund or defined purpose. A transfer is not automatically discretionary, and it should not be counted twice when looking at the Citywide budget.

RESTRICTED / DEDICATED FUNDS
Separate

Sanitation, Wastewater, One-Cent allocations, Gas Tax and other dedicated funds have rules, service purposes or legal restrictions attached to them. They cannot simply be redirected to any unrelated purpose.

COUNCIL POLICY FLEXIBILITY
After Review

This is where real budget choices begin — after restricted dollars, existing commitments and operationally necessary spending are identified.

The better question is not just “Does the City have the money?” Ask: What fund is it in? Is it restricted, committed or operationally necessary? If not, is using it here a Council policy choice?
The Main Operating Bucket

City of Prattville FY27 General Fund

This is the City's primary operating fund. Most recurring taxes, licenses and fees come here, and most core City services are paid from here.

FY27 Final: budgeted expenditures are $5.14M above current-year General Fund revenue. This is not a simple operating deficit; the budget includes transfers, reserves and other financing activity.
Money In
$65.70M
Money Out
$70.84M
Payroll & Related
$40.281M
General Fund Transfers
$12.274M

FY26 Actual Performance → FY27 Final Budget June 2026 unaudited YTD adds context to the adopted budget

Area FY26 Budget FY26 YTD through July % Used FY27 Final
Police Department $12.5M $10.34M 82.68% $13.579M
Fire Department $11.68M $9.828M 84.16% $13.367M
Parks & Recreation $5.832M $3.833M 65.73% $7.452M
Community Initiatives $2.455M $1.868M 76.10% $1.918M
How to read this: FY26 YTD is unaudited spending through July, not a year-end actual. The July expenditure report shows 83.33% of FY26 had elapsed for most expenditure categories. A department above or below 75% is not automatically over or under budget because payroll, purchases, transfers, capital work and debt payments occur on different schedules.

So what is the “entire City budget”?

There is not one single spendable City bucket. Prattville uses multiple funds for different purposes. The General Fund is the largest operating fund, while Sanitation and Wastewater are separate fee-funded accounts and other funds handle roads, courts, debt and capital projects. Simply adding every fund together can also double-count money transferred from one City fund to another.

Other City Funds Click a fund to follow IN → BUCKET → OUT

Sanitation (Restricted Account)
Solid waste collection restricted service fund
Fee-funded: A separate service fee collected on your water bill supports this account — not general City taxes.
Money In
$5.208M
Money Out
$4.368M
Budgeted difference: +$840K
Spending Comparison
FY26 Budget
$3.938M
→
FY27 Final
$4.368M
+$429K
+10.9%
FY26 is the public City budget baseline. FY27 is the final FY27 budget adopted by Council.
Wastewater (Restricted Account)
Wastewater restricted utility and capital program
Fee-funded: A separate service fee collected on your water bill supports this account — not general City taxes.
Money In
$60.66M
Money Out
$58.21M
Budgeted difference: +$2.444M
Spending Comparison
FY26 Budget
$22.82M
→
FY27 Final
$58.21M
+$35.4M
+155.1%
FY26 is the public City budget baseline. FY27 is the final FY27 budget adopted by Council.
Gas Tax Fund
Road and paving special revenue
Money In
$3.656M
Money Out
$4.056M
Planned use beyond inflow: $-400K
Spending Comparison
FY26 Budget
$3.79M
→
FY27 Final
$4.056M
+$266K
+7.0%
FY26 is the public City budget baseline. FY27 is the final FY27 budget adopted by Council.
Capital Projects
Major projects, grants and dedicated project funding
Money In
$14.07M
Money Out
$17.95M
Planned use beyond inflow: $-3.882M
Spending Comparison
FY26 Budget
$21.83M
→
FY27 Final
$17.95M
−$3.874M
−17.7%
FY26 is the public City budget baseline. FY27 is the final FY27 budget adopted by Council.
Judicial
Municipal court special revenue
Money In
$1.291M
Money Out
$1.291M
Balanced
Spending Comparison
FY26 Budget
$1.27M
→
FY27 Final
$1.291M
+$20.7K
+1.6%
FY26 is the public City budget baseline. FY27 is the final FY27 budget adopted by Council.
Striplin Business Center
Restricted business center / renovation project year
Money In
$3.198M
Money Out
$3.198M
Balanced
Debt Service
Scheduled principal and interest payments
Money In
$3.141M
Money Out
$3.141M
Balanced
Spending Comparison
FY26 Budget
$3.239M
→
FY27 Final
$3.141M
−$98.6K
−3.0%
FY26 is the public City budget baseline. FY27 is the final FY27 budget adopted by Council.
Simple rule: A dollar can look available on paper and still be restricted, committed, one-time, debt-funded, or tied to another service. Open the bucket before calling it available.

Fund Explorer

Choose a fund across the bar. The selected bucket opens directly below.

Revenue Comparison
FY26 Budget
$61.62M
→
FY27 Final
$65.70M
+$4.082M
+6.6%
FY26 is the public City budget baseline. FY27 is the final FY27 budget adopted by Council.

Money Comes In

$65.70M
Sales tax
Local sales-tax revenue collected on taxable purchases.
$23M
Business licenses
Fees businesses pay to operate within the City.
$8.14M
Restaurant tax
Tax revenue generated by prepared food and restaurant sales.
$6.05M
Ad valorem - Autauga
Property-tax revenue received from property in Autauga County.
$4.6M
State simple sales/use
State-distributed sales and use tax revenue.
$4.2M
Lodging tax
Tax collected from hotel and other lodging stays.
$3.69M
Use tax
Tax on taxable purchases where sales tax was not collected at the point of sale.
$3.4M
District tax
Revenue from designated local tax districts.
$2M
Other General Fund revenue $10.62M
→
GENERAL FUND
Money Coming In
$65.70M
Primary City operating fund
Fiscal Year 2027 final Spending
$70.84M
budgeted spending Above FY27 Revenue
$5.14M

What does this mean?

The final FY27 budget shows General Fund expenditures $5.14M above current-year General Fund revenue. This is not a simple operating deficit; the budget includes transfers, reserves and other financing activity.

EXISTING FUND BALANCE Accumulated prior-year General Fund resources may be budgeted where legally available.
YEAR-END PERFORMANCE Higher-than-budgeted revenue or lower-than-budgeted spending can reduce the actual draw.
BUDGET CHANGES Council can amend, defer or reprioritize budgeted expenditures through later budget action.
OTHER VERIFIED RESOURCES Other legally available resources or transfers may be considered after verification.
What This Fund Pays For
Police & Fire Public Works & City Operations Parks & Recreation Administration & Community Services
→

Money Goes Out

$70.84M
Payroll & related costs
Employee salaries, benefits and related personnel costs.
$40.28M
Transfers out
Money moved from the General Fund to another City fund for a defined purpose.
$12.27M
Police Department
Personnel, operations and other costs of providing police services.
$13.58M
Fire Department
Personnel, operations and other costs of providing fire and emergency response.
$13.37M
Parks & Recreation
Costs to operate parks, recreation programs and related facilities.
$7.452M
Community initiatives
Council-supported funding for community organizations and public-benefit programs.
$1.918M
City / County agencies
Funding for partner agencies that provide services to City residents.
$557K
Some expense lenses overlap. Payroll is already inside department totals; use the right side to understand the structure, not to add the lines together.
Revenue Comparison
FY26 Budget
$3.769M
→
FY27 Final
$5.208M
+$1.438M
+38.2%
FY26 is the public City budget baseline. FY27 is the final FY27 budget adopted by Council.
Spending Comparison
FY26 Budget
$3.938M
→
FY27 Final
$4.368M
+$429K
+10.9%
FY26 is the public City budget baseline. FY27 is the final FY27 budget adopted by Council.

Money Comes In

$5.208M
Prattville Water Works Board sanitation receipts $5M
Billing $50.0K
Special pickups
Fees for sanitation pickups outside normal collection service.
$50.0K
Recycling $25.0K
Scrap metal $2.5K
Truck trade-in / fixed asset gain $80.0K
Interest
Interest earned on City cash balances.
$100
→
SANITATION (Restricted Account)
Money Coming In
$5.208M
CONFIRMED FY27 revenue reflects the approved rate increase.
Solid waste collection restricted service fund
Fiscal Year 2027 final Spending
$4.368M
Difference
$840K
What This Fund Pays For
Garbage collection Collection trucks & equipment Landfill / disposal costs Sanitation personnel & operations
→

Money Goes Out

$4.368M
Salaries
Employee wages and salaries charged to this fund.
$1.32M
Tipping fees
Charges paid to dispose of collected solid waste at a landfill or disposal facility.
$750K
Sanitation capital outlay — garbage trucks and service equipment
Garbage trucks and other major equipment used to collect and manage solid waste.
$640K
Group health transfer
Funding transferred to support employee health-benefit costs.
$312K
Sanitation vehicle maintenance — repair and upkeep of collection vehicles
Repairs and preventive maintenance for the sanitation collection fleet.
$230K
Prattville Water Works Board collection fee $210K
Sanitation fuel and oil — collection fleet operating cost
Fuel and lubricants needed to operate garbage collection vehicles.
$175K
Sanitation operating supplies — materials used to provide collection service
Routine materials and supplies used by sanitation crews and operations.
$85.0K
Insurance $88.9K
Budgeted positive difference is about $839.7K, but this is still an enterprise/service fund.
One Bill — Three Different Services
Your utility bill contains separate charges for Water, Wastewater and Sanitation. The City does not operate the water system. Water service is provided by the Prattville Water Works Board. The Sanitation charge collected on your water bill is a separate City service fee. It funds the City's Sanitation Restricted Account and helps pay the cost of garbage collection and disposal.

Fee-funded money follows the service.

These charges are collected to support the specific service shown here. They should not be treated like unrestricted General Fund tax revenue available for unrelated City purposes.

WATER Prattville Water Works Board
Not a City budget account
WASTEWATER City of Prattville
Fee-funded restricted account
SANITATION City of Prattville
Fee-funded restricted account
Revenue Comparison
FY26 Budget
$7.796M
→
FY27 Final
$60.66M
+$52.86M
+678.1%
FY26 is the public City budget baseline. FY27 is the final FY27 budget adopted by Council.
Spending Comparison
FY26 Budget
$22.82M
→
FY27 Final
$58.21M
+$35.4M
+155.1%
FY26 is the public City budget baseline. FY27 is the final FY27 budget adopted by Council.

Money Comes In

$60.66M
Debt proceeds
Borrowed money received to finance major wastewater capital improvements.
$49.35M
Sewer charges
Revenue paid by customers for wastewater service.
$9.45M
Billing charges $1.125M
Impact fees $700K
Other $33.5K
→
WASTEWATER (Restricted Account)
Money Coming In
$60.66M
CONFIRMED FY27 revenue reflects the approved rate increase.
Wastewater restricted utility and capital program
Fiscal Year 2027 final Spending
$58.21M
Difference
$2.444M
What This Fund Pays For
Sewer operations & treatment Sewage-system infrastructure Drainage-related infrastructure Wastewater debt & major equipment
→

Money Goes Out

$58.21M
Wastewater capital projects — sewage system and drainage-related infrastructure
Large construction and infrastructure work tied to the wastewater system, including sewage-system and drainage-related improvements.
$50.5M
Debt service
Scheduled principal and interest payments on existing debt.
$1.943M
Salaries
Employee wages and salaries charged to this fund.
$1.596M
Wastewater capital outlay — equipment and long-lived assets used by the wastewater system
Major equipment and other long-lived assets needed to operate and maintain the wastewater system.
$845K
Group health transfer
Funding transferred to support employee health-benefit costs.
$312K
Wastewater treatment chemicals
Chemicals used to treat wastewater safely and operate the treatment process.
$310K
The large FY27 total is mostly capital financing: $49.35M of the inflow is debt proceeds.
One Bill — Three Different Services
Your utility bill contains separate charges for Water, Wastewater and Sanitation. The City does not operate the water system. Water service is provided by the Prattville Water Works Board. The Wastewater charge collected on your water bill is a separate City service fee. It funds the City's Wastewater Restricted Account and supports sewer operations and related obligations. Major capital projects may also use dedicated financing such as debt proceeds.

Fee-funded money follows the service.

These charges are collected to support the specific service shown here. They should not be treated like unrestricted General Fund tax revenue available for unrelated City purposes.

WATER Prattville Water Works Board
Not a City budget account
WASTEWATER City of Prattville
Fee-funded restricted account
SANITATION City of Prattville
Fee-funded restricted account
Spending Comparison
FY26 Budget
$3.79M
→
FY27 Final
$4.056M
+$266K
+7.0%
FY26 is the public City budget baseline. FY27 is the final FY27 budget adopted by Council.

Money Comes In

$3.656M
Engineering / paving grants $2.273M
General Fund One-Cent Infrastructure $769K
Rebuild Alabama gas tax $335K
Other gas/excise taxes $279K
Interest
Interest earned on City cash balances.
$200
→
GAS TAX FUND
Money Coming In
$3.656M
Road and paving special revenue
Fiscal Year 2027 final Spending
$4.056M
Difference
$-400K
What This Fund Pays For
Street paving Road improvements Transportation grants & matching funds Related road-project costs
→

Money Goes Out

$4.056M
Metropolitan Planning Organization - Sheila Boulevard $1.158M
Local paving — City street resurfacing and paving work
City-funded resurfacing and paving of local streets.
$1.059M
Metropolitan Planning Organization - 4th Street $618K
College Heights paving $611K
Gardner / Rolling Hills $450K
Cemetery paving $160K
FY27 spending includes $400K of FY26 reserves.
The $400,000 FY27 Gas Tax difference is supported by $400,000 of FY26 reserves budgeted for local paving.
Spending Comparison
FY26 Budget
$21.83M
→
FY27 Final
$17.955M
−$3.874M
−17.7%
FY26 is the public City budget baseline. FY27 is the final FY27 budget adopted by Council.
FY26 Budget → FY27 Final
$21.83M → $17.955M
−$3.874M
−17.7%
The final FY27 budget includes about $3.87M less Capital Projects spending than the FY26 budget — approximately 17.7% lower. This is a budget-to-budget comparison, not a statement of actual FY26 spending.

Money Comes In

$14.073M
Grant income
Grant funding received for specific capital projects.
$5.286M
State of Alabama
State funding provided for approved City projects.
$4.304M
General Fund One-Cent Infrastructure $2.693M
Lodging fee $667K
General Fund One-Cent Parks & Recreation $483K
Alabama Trust Fund $345K
Federal grants $144K
Interest
Interest earned on City cash balances.
$150K
→
CAPITAL PROJECTS
Money Coming In
$14.073M
Major projects, grants and dedicated project funding
Fiscal Year 2027 final Spending
$17.955M
Difference
$-3.882M
What This Fund Pays For
Roads & drainage Sidewalks & public facilities Major construction projects Grant-funded City improvements
→

Money Goes Out

$17.955M
Capital Projects — roads, drainage, sidewalks, facilities and other long-term City improvements
Long-term City improvements such as roads, drainage, sidewalks, buildings and other public infrastructure.
$16.83M
Main Capital Projects spending bucket
This line contains the long-term City improvement projects funded through the Capital Projects Fund. The individual project examples shown below are already included inside this total.
Capital Projects Fund → $16.83M project bucket → individual roads / drainage / facilities projects
Transfer to General Fund $528K
Transfer to General Fund
This is money moving from the Capital Projects Fund into the General Fund. One fund's expenditure becomes another fund's revenue, so this transfer should not be counted twice when looking at the City as a whole.
Capital Projects Fund → $528K transfer → General Fund
Transfer to Debt Service $601K
Transfer to Debt Service
This is money moving from Capital Projects into the Debt Service Fund to support scheduled debt obligations. The June 30, 2026 City-Wide Accounts Payable and Debt Balances report shows $64.707M of total outstanding City debt, with repayment sources spread across General Government, Wastewater and dedicated revenue streams. This $601K FY27 transfer is a budgeted fund movement; it is not the City's total debt payment or total debt balance.
Capital Projects Fund → $601K FY27 transfer → Debt Service Fund → scheduled debt obligation
Wetumpka St drainage (inside total) $1.39M
Wetumpka Street Drainage
This project amount is already included inside the larger Capital Projects total. It should not be added again on top of the $16.83M project bucket.
Capital Projects Fund → $1.39M → Wetumpka Street drainage
McQueen Smith paving (inside total) $1.339M
McQueen Smith Paving
This project amount is already included inside the larger Capital Projects total. It is one component of the overall FY27 Capital Projects spending plan.
Capital Projects Fund → $1.339M → McQueen Smith paving
North Highland Park (inside total) $1.233M
North Highland Park
This project amount is already included inside the larger Capital Projects total. It is one component of the overall FY27 Capital Projects spending plan.
Capital Projects Fund → $1.23M → North Highland Park
Project examples on the right are included inside the $16.826M project total.
Capital Projects is a project fund, not recurring annual operating spending. FY27 totals include grants, One-Cent transfers, prior financing/reserve sources and project-specific funding.
Spending Comparison
FY26 Budget
$1.27M
→
FY27 Final
$1.291M
+$20.7K
+1.6%
FY26 is the public City budget baseline. FY27 is the final FY27 budget adopted by Council.

Money Comes In

$1.291M
Fines
Municipal court fine revenue.
$600K
General Fund transfer
Money transferred from the City's primary operating fund to support this fund.
$384K
Correction Fund
Court-related revenue dedicated to correction or judicial purposes.
$175K
City court costs $65.0K
Municipal Judicial Administration Fund $38.0K
Bond fund / fees $20.0K
Other $8.8K
→
JUDICIAL
Money Coming In
$1.291M
Municipal court special revenue
Fiscal Year 2027 final Spending
$1.291M
Difference
$0
What This Fund Pays For
Municipal court operations Metro Jail costs Court personnel Judicial operating expenses
→

Money Goes Out

$1.291M
Metro Jail operating cost — City share of housing municipal inmates
The City's share of the cost to house municipal inmates at the Metro Jail.
$734K
Salaries
Employee wages and salaries charged to this fund.
$354K
Group health transfer
Funding transferred to support employee health-benefit costs.
$78.0K
Building maintenance
Repair and maintenance costs for City buildings or facilities.
$12.8K
Special judges/prosecutors $10.0K
Other $17.0K
Court-generated revenue does not fully cover cost; General Fund support closes the gap.

Money Comes In

$3.198M
Federal grant
Federal grant funding restricted to the approved project or program.
$2.2M
General Fund transfer
Money transferred from the City's primary operating fund to support this fund.
$906K
3rd-floor rent $37.0K
1st-floor rent $27.0K
Renovation fee $28.0K
→
STRIPLIN BUSINESS CENTER
Money Coming In
$3.198M
Restricted business center / renovation project year
Fiscal Year 2027 final Spending
$3.198M
Difference
$0
What This Fund Pays For
Building renovations Training / incubator space Building maintenance Utilities & facility operations
→

Money Goes Out

$3.198M
Second-floor training / business incubator project
Renovation and build-out of space for workforce training and business-incubator use.
$2.2M
First-floor building renovations
Renovation work on the first floor of the Striplin Business Center.
$850K
Building maintenance
Repair and maintenance costs for City buildings or facilities.
$60.0K
Information Technology building maintenance $20.0K
Utilities
Electricity, water, gas or other utility costs.
$58.0K
Insurance $10.0K
FY27 is grant/renovation heavy, not a normal recurring operating year.
FY27 Striplin Business Center funding includes $2.2M of grant income and $906K transferred from the General Fund: $850K of Bank Building Renovation reserves plus $56K to balance the fund. These are not ordinary recurring operating revenues.
Spending Comparison
FY26 Budget
$3.239M
→
FY27 Final
$3.141M
−$98.6K
−3.0%
FY26 is the public City budget baseline. FY27 is the final FY27 budget adopted by Council.

Money Comes In

$3.141M
General Fund One-Cent Parks & Recreation $1.525M
General Fund One-Cent Infrastructure $630K
Capital Projects transfer $601K
General Fund One-Cent Public Facilities $301K
General Fund - other $84.2K
→
DEBT SERVICE
Money Coming In
$3.141M
Scheduled principal and interest payments
Fiscal Year 2027 final Spending
$3.141M
Difference
$0
What This Fund Pays For
Principal payments Interest payments General Obligation Warrants Other scheduled City debt
→

Money Goes Out

$3.141M
2025 General Obligation Warrants
Scheduled debt payment on General Obligation Warrants issued in 2025.
$940K

2025 General Obligation Warrants

The FY27 Debt Service line shows a scheduled payment of $940K. The June 30, 2026 City-wide debt report shows approximately $14.605M outstanding on the GO 2025 Warrants.

  • City Hall Annex renovations
  • Vista Pointe Park improvements
  • Public Safety Training Facility
  • Stanley Jensen Stadium renovations
  • Newton Park renovations — Phase II
  • Spillway Park improvements
  • Laney Drive Extension
Repayment structure identified in the June debt report: 5% Infrastructure One-Cent / 25% Public Facilities One-Cent / 70% Parks & Recreation One-Cent.
The $940K shown here is a scheduled FY27 debt-service payment, not the $14.605M outstanding principal balance.
2022-B General Obligation Warrants
Scheduled debt payment on the 2022-B General Obligation Warrants.
$507K

2022-B General Obligation Warrants

The FY27 Debt Service line shows a scheduled payment of $507K. The June 30, 2026 debt report identifies approximately $1.675M outstanding for the federally taxable 2022-B Warrants.

  • City debt report describes the purpose as various projects.
  • The current public source set reviewed for this portal does not provide a sufficiently clean project-by-project match for this specific annual payment.
The portal stops at the level the City source supports rather than assigning projects by inference.
The $507K annual payment is not the same as the remaining outstanding principal.
2022-A General Obligation Warrants
Scheduled debt payment on the 2022-A General Obligation Warrants.
$425K

2022-A General Obligation Warrants

The FY27 Debt Service line shows a scheduled payment of $425K. The June 30, 2026 debt report identifies approximately $9.885M outstanding for the 2022-A Warrants.

  • Tier 1 park projects
  • Pratt Park
  • Newton Park
  • Stanley Jensen Stadium
The June debt report identifies these as park-project obligations supported by dedicated repayment sources.
Outstanding principal and the annual scheduled debt-service payment are different measures.
Road and Bridge - Industrial Park $372K

Road and Bridge — Industrial Park

The FY27 Debt Service schedule shows $372K for this line.

  • The June debt report separately identifies City debt associated with Economic Development / South Industrial Park.
  • That report shows approximately $1.063M outstanding on the GO 2019 Warrant tied to South Industrial Park.
Related public debt reference: GO 2019 Warrant — Economic Development / South Industrial Park.
The current documents reviewed do not explicitly state that the entire $371.8K annual line maps only to that one warrant, so the portal does not force a one-to-one match.
Mac Gray Park 2.0 $361K

Mac Gray Park 2.0

The FY27 Debt Service schedule shows $361K for Mac Gray Park 2.0.

  • June 30, 2026 outstanding balance: approximately $3.107M.
  • The City debt report identifies Lodging Fee receipts as the repayment source.
  • Those receipts are restricted for Parks & Recreation capital improvements.
This is a useful example of debt with a dedicated repayment stream rather than unrestricted General Fund cash.
The $361K annual payment and the $3.107M outstanding balance are different concepts.
Public facilities debt share $301K

Public Facilities Debt Share

The FY27 Debt Service schedule shows $301K from the Public Facilities One-Cent designation.

  • June 30, 2026 debt report attributes approximately $3.651M of outstanding GO 2025 debt to the Public Facilities share.
  • GO 2025 repayment structure: 25% Public Facilities One-Cent / 70% Parks & Recreation One-Cent / 5% Infrastructure One-Cent.
This line is dedicated debt support; it is not a general-purpose cash allocation.
Annual debt-service support and outstanding principal should not be added together.
Other debt $235K

Other Scheduled Debt

The FY27 Debt Service schedule groups $235K into this remainder line.

  • The current portal source set does not provide a defensible line-by-line breakout of this grouped remainder.
  • Rather than guess, the Explorer identifies where the public detail ends.
PUBLIC DETAIL ENDS HERE in the current source set.
Additional Finance debt schedules could allow this remainder to be split further later.
Dedicated transfers come in; scheduled debt payments go out.

One-Cent Sales Tax

Select a designated area to follow the money from allocation to final FY27 use and commitment status.

Use the buttons below to change the One-Cent designation. The allocation wheel is shown for reference in this live-safe version.

One-Cent Sales Tax

See how the penny is allocated, then select a designated area to follow the money from estimated annual allocation to the bucket, budgeted spending and current commitment status.

How to read the colors Money In / Revenue Balance / Existing Funds Money Out / budgeted spending Restricted / Committed Pending / Needs Validation
$9.124M
Reference Annual One-Cent Revenue
Finance Director FY27 estimate: $9,124,285.71 total One-Cent revenue.
FY27 FINANCE ESTIMATE
$912.4K
10% Reserve — FY27 Estimate
FY27 estimated 10% General Fund Reserve allocation: $912,428.57.
$2.053M
Each 22.5% Slice — FY27 Estimate
Education, Parks & Recreation, Infrastructure and Public Facilities each receive the same 22.5% share.

How the One-Cent Tax Is Divided Allocation map — not a spending chart

Reserve 10% Education 22.5% Parks & Recreation 22.5% Infrastructure 22.5% Public Facilities 22.5% PARKS & RECREATION R.5% $2.053M reference
CURRENT SELECTION
PARKS & RECREATION — 22.5%
Follow this money: allocation → FY26 actual/YTD activity → FY27 Final use → commitments / restrictions. The detail immediately below changes with this selection.

Parks & Recreation Detail Follow the money from allocation to final FY27 use

FY26 ACTUAL / YTD FY27 Final DOCUMENTED COMMITMENTS
How to read the colors Money In / Revenue Balance / Existing Funds Money Out / budgeted spending Restricted / Committed Pending / Needs Validation
FY26 PUBLIC ACTUAL / YTD DETAIL — THROUGH JULY 2026
Public June records identify One-Cent transfers from the Parks & Recreation designation into Debt Service and Capital Projects.
  • Transfer to Debt Service — YTD through June:$1.593M
  • Transfer to Capital Projects — YTD through June:$3.451M
  • FY26 budgeted One-Cent uses:$4.587M
Source basis: City of Prattville public FY26 budget materials and June 2026 unaudited expenditure reporting. “Budgeted,” “transferred,” “paid,” and “outstanding debt” are kept separate rather than treated as interchangeable.
1 · Estimated Money In
$2.053M
FY27 estimated 22.5% allocation based on the Finance Director's final budget review: $2,052,964.29.
FY27 Finance Estimate
2 · The Bucket
22.5%
Dedicated one-cent sales-tax dollars used for parks, recreation facilities, projects and related debt service.

Accumulated prior-year balance: VERIFY
3 · FY27 Budgeted Money Out
$4.587M
Budgeted uses shown by Finance. This is spending from the designated bucket — not the amount of the annual allocation.
  • 2022-A General Obligation Warrants Debt Service — $425K
  • 2022-B General Obligation Warrants Debt Service — $507K
  • 2025 General Obligation Warrants Debt Service — $592K
  • Whetstone Park Fields — $365K
  • Whetstone Park Fields 2 & 3 — $163K
  • Whetstone Fencing — $433K
  • Upper Kingston Playground — $58.0K
  • Upper Kingston Lighting — $900K
  • Mac Gray 2.0 Batting Cages — $60.0K
  • Bell Park Fencing — $50.0K
  • Bell Park Lighting — $430K
  • Splashpad Renovation — $75.0K
  • Kiwanis Park Playground — $45.0K
  • North Highland Park — $483,478.61
4 · Commitment / Policy Status
DOCUMENTED DEBT
What is committed, expiring, pending or still needs validation?
  • Debt supported by Parks & Recreation One-Cent: approximately $21.784M outstanding as of 6/30/2026.
  • Includes dedicated support for 2022-A/2022-B and 2025 warrant obligations; annual payments follow the debt schedule.
Debt balance source: City of Prattville City-Wide Accounts Payable and Debt Balances, 6/30/2026. Outstanding balance is not the same as the annual debt-service payment.
Debt Service — Level 2 obligation detail Click to see payment, balance, purpose & repayment details

Open an obligation below to see the annual payment, principal/interest where documented, remaining balance where documented, purpose, repayment source and source limitations.

2022-A General Obligation Warrants — $425K
FY27 Final payment
$425K
Principal
$0
Interest
$425K
Outstanding principal
≈ $9.885M
Balance date
6/30/2026
Repayment source
Parks & Recreation One-Cent

WHAT DID THIS OBLIGATION SUPPORT?

  • Tier 1 park projects
  • Pratt Park
  • Newton Park
  • Stanley Jensen Stadium

WHAT DOES THIS MEAN?

The FY27 debt schedule shows no principal payment on 2022-A in FY27. The budget notes that the first principal payment is scheduled for FY2032, after the 2022-B warrant is paid off.

Do not add these numbers together. The FY27 payment is this year's scheduled debt service. Outstanding principal is the remaining debt balance as of the stated date.
Source basis: FY27 Debt Service Fund / Mayor's Budget and City-Wide Accounts Payable and Debt Balances as of June 30, 2026.
2022-B General Obligation Warrants — $507K
FY27 Final payment
$507K
Principal
$435K
Interest
$72.4K
Outstanding principal
≈ $1.675M
Balance date
6/30/2026
Repayment source
Parks & Recreation One-Cent

WHAT DID THIS OBLIGATION SUPPORT?

  • City debt material describes the purpose broadly as “various projects.”

WHAT DOES THIS MEAN?

Unlike 2022-A, the FY27 payment includes both principal and interest.

PUBLIC DETAIL ENDS HERE: The reviewed City source set does not provide a sufficiently reliable project-by-project allocation for the 2022-B annual payment, so the Explorer does not assign individual projects by inference.
Do not add these numbers together. The FY27 payment is this year's scheduled debt service. Outstanding principal is the remaining debt balance as of the stated date.
Source basis: FY27 Debt Service Fund / Mayor's Budget and City-Wide Accounts Payable and Debt Balances as of June 30, 2026.
2025 General Obligation Warrants — P&R share — $592K
FY27 Final payment
$592K
Principal
Not separately documented
Interest
Not separately documented
Outstanding principal
≈ $14.605M total issue balance
Balance date
6/30/2026
Repayment source
70% P&R / 25% Public Facilities / 5% Infrastructure One-Cent

WHAT DID THIS OBLIGATION SUPPORT?

  • City Hall Annex renovations
  • Vista Pointe Park improvements
  • Public Safety Training Facility
  • Stanley Jensen Stadium renovations
  • Newton Park renovations — Phase II
  • Spillway Park improvements
  • Laney Drive Extension

WHAT DOES THIS MEAN?

The 2025 warrant is supported by multiple One-Cent designations. The amount shown here is the Parks & Recreation share in the FY27 Final budget, not the entire 2025 warrant payment.

Do not add these numbers together. The FY27 payment is this year's scheduled debt service. Outstanding principal is the remaining debt balance as of the stated date.
Source basis: FY27 Debt Service Fund / Mayor's Budget, Capital Projects Fund, and City-Wide Accounts Payable and Debt Balances as of June 30, 2026.

What Does This Mean?

The designated percentage determines how One-Cent collections flow into this bucket. Annual spending can be higher or lower than the current-year inflow because money can accumulate from prior years and because projects, debt and other obligations occur on different schedules.

Finance's budget presentation shows $4,587,443 in budgeted Parks & Recreation One-Cent uses. This is spending from the designated Parks & Recreation bucket and is not the amount of the annual 22.5% allocation itself.
Additional Commitment / Reference Item Amount / Status
General Fund One-Cent Parks & Recreation → Debt Service $1,524,855.89
General Fund One-Cent Parks & Recreation → Capital Projects $483,478.61
Important: The four designated areas each receive the same 22.5% share, while 10% is directed to General Fund Reserves. Finance Director FY27 estimate: $9,124,285.71 total, $912,428.57 to reserves, and $2,052,964.29 to each 22.5% designated area.

Allocation is not the same as annual spending.

The percentage determines how current One-Cent collections flow into each designated bucket. A bucket may also contain money accumulated from prior years, and debt or project schedules can cause annual spending to be higher or lower than the current-year inflow.

FY26 → FY27 One-Cent Budgeted Use Same designated buckets, year-over-year context

Designated Area FY26 Budgeted Use FY27 Final Use $ Change % Change
Parks & Recreation $2.799M $2.008M −$792K −28.3%
Education $1.982M $1.707M −$275K −13.9%
Infrastructure $3.624M $4.092M +$468K +12.9%
Public Facilities $3.719M $301K −$3.418M −91.9%
Why aren't these amounts equal to the 22.5% annual allocation? The allocation determines how current One-Cent collections flow into each designated bucket. Budgeted use can be higher or lower because designated balances can carry forward from prior years and because projects, debt service and commitments occur on different schedules.
FY26 baseline: City of Prattville FY2026 public budget presentation, “Use of One Cent Funds.” FY27 figures shown here reflect the adopted Final FY2027 budget. Education-specific figures remain under validation where noted.
Final FY27 Parks & Recreation One-Cent transfers: $483,478.61 to Capital Projects and $1,524,855.89 to Debt Service. These receiving-fund entries are the same dollars moving between City funds.

One-Cent Sales Tax

See how the penny is allocated, then select a designated area to follow the money from estimated annual allocation to the bucket, budgeted spending and current commitment status.

How to read the colors Money In / Revenue Balance / Existing Funds Money Out / Budgeted Spending Restricted / Committed Pending / Needs Validation
$9.124M
Reference Annual One-Cent Revenue
Finance Director FY27 estimate: $9,124,285.71 total One-Cent revenue.
FY27 FINANCE ESTIMATE
$912.4K
10% Reserve — FY27 Estimate
FY27 estimated 10% General Fund Reserve allocation: $912,428.57.
$2.053M
Each 22.5% Slice — FY27 Estimate
Education, Parks & Recreation, Infrastructure and Public Facilities each receive the same 22.5% share.

How the One-Cent Tax Is Divided Allocation map — not a spending chart

Reserve 10% Education 22.5% Parks & Recreation 22.5% Infrastructure 22.5% Public Facilities 22.5% EDUCATION R.5% $2.053M reference
CURRENT SELECTION
EDUCATION — 22.5%
Follow this money: allocation → FY26 actual/YTD activity → FY27 final use → commitments / restrictions. The detail immediately below changes with this selection.
Finance / Education distinction: The Final FY27 General Fund appropriation line for the Autauga County Board of Education is $0. That does not mean City funding to ACBOE is $0. The August 2026 tax report confirms a separate $63,344.40 Board of Education payment through the City's sales-tax / education funding mechanism. The broader Education allocation remains under reconciliation and is not rewritten here.

Education Detail Follow the money from allocation to final FY27 use

FY26 ACTUAL / YTD FY27 FINAL COUNCIL REVIEW
How to read the colors Money In / Revenue Balance / Existing Funds Money Out / Budgeted Spending Restricted / Committed Pending / Needs Validation
FY26 PUBLIC ACTUAL / YTD DETAIL — THROUGH JULY 2026
The July public expenditure report documents current education One-Cent payments in Community Initiatives and identifies the Board of Education and CACC payment amounts in its footnotes. The public records reviewed do not support collapsing all Education activity into one simple 'spent' total without mixing different reporting treatments.
  • Board of Education One-Cent payment identified in July report footnote:$61.8K
  • Central Alabama Community College One-Cent payment identified in July report footnote:$45.7K
  • FY26 budgeted Education One-Cent uses:$1.707M
Source basis: City of Prattville public FY26 budget materials and June 2026 unaudited expenditure reporting. “Budgeted,” “transferred,” “paid,” and “outstanding debt” are kept separate rather than treated as interchangeable.
1 · Estimated Money In
$2.053M
FY27 estimated 22.5% allocation based on the Finance Director's final budget review: $2,052,964.29.
FY27 Finance Estimate
2 · The Bucket
22.5%
Dedicated education portion of the City one-cent sales tax.

Accumulated prior-year balance: VERIFY
3 · FY27 Budgeted Money Out
$1.707M
Budgeted uses shown by Finance. This is spending from the designated bucket — not the amount of the annual allocation.
  • Board of Education - School Resource Officers — $525,857.05
  • The Pratt — $1.181M
4 · Commitment / Policy Status
UNDER REVIEW
What is committed, expiring, pending or still needs validation?
  • CACC — UNDER VALIDATION prior annual allocation · RENEWAL PENDING
  • ACBOE direct allocation — UNDER VALIDATION prior annual allocation · PRIOR COMMITMENT EXPIRING
  • School Resource Officers — $525,857.05 from Education funds (75% of 8 total SROs)
  • The Pratt — existing education commitment
FY26 Education actual/YTD — documented July payments
Board of Education One-Cent payment identified in July report footnote $61.8K
Central Alabama Community College One-Cent payment identified in July report footnote $45.7K
Source: July 2026 unaudited Council Expenditure Report. These are FY26 YTD/public-reporting figures, not FY27 available transition funding.

What Does This Mean?

The Education portion receives the same 22.5% share as the other three designated areas. The amount budgeted to be spent in a particular year does not have to equal the amount collected that year because designated funds may carry forward from prior years. FY27 also includes policy decisions involving prior CACC and ACBOE allocations.

Education Allocations Under Validation

UNDER VALIDATION

CACC ( UNDER VALIDATION ) plus the prior ACBOE direct allocation ( UNDER VALIDATION ). These dollars are not counted as available transition funding. Their FY27 treatment depends on renewal decisions, final budget treatment, applicable agreements and verification of permitted uses.

Finance's budget presentation shows $1,706,874 in FY27 budgeted Education One-Cent uses: School Resource Officers and The Pratt. This is budgeted use from the Education bucket, not the gross annual 22.5% allocation.
Additional Commitment / Reference Item Amount / Status
FY27 budgeted Education One-Cent uses shown by Finance $1.707M
Existing commitments / redirectable amount VERIFY
Important: The four designated areas each receive the same 22.5% share, while 10% is directed to General Fund Reserves. Finance Director FY27 estimate: $9,124,285.71 total, $912,428.57 to reserves, and $2,052,964.29 to each 22.5% designated area.

Allocation is not the same as annual spending.

The percentage determines how current One-Cent collections flow into each designated bucket. A bucket may also contain money accumulated from prior years, and debt or project schedules can cause annual spending to be higher or lower than the current-year inflow.

FY26 → FY27 One-Cent Budgeted Use Same designated buckets, year-over-year context

Designated Area FY26 Budgeted Use FY27 Final Use $ Change % Change
Parks & Recreation $2.799M $2.008M −$792K −28.3%
Education $1.982M $1.707M −$275K −13.9%
Infrastructure $3.624M $4.092M +$468K +12.9%
Public Facilities $3.719M $301K −$3.418M −91.9%
Why aren't these amounts equal to the 22.5% annual allocation? The allocation determines how current One-Cent collections flow into each designated bucket. Budgeted use can be higher or lower because designated balances can carry forward from prior years and because projects, debt service and commitments occur on different schedules.
FY26 baseline: City of Prattville FY2026 public budget presentation, “Use of One Cent Funds.” FY27 figures shown here reflect the adopted Final FY2027 budget. Education-specific figures remain under validation where noted.

One-Cent Sales Tax

See how the penny is allocated, then select a designated area to follow the money from estimated annual allocation to the bucket, budgeted spending and current commitment status.

How to read the colors Money In / Revenue Balance / Existing Funds Money Out / budgeted spending Restricted / Committed Pending / Needs Validation
$9.124M
Reference Annual One-Cent Revenue
Finance Director FY27 estimate: $9,124,285.71 total One-Cent revenue.
FY27 FINANCE ESTIMATE
$912.4K
10% Reserve — FY27 Estimate
FY27 estimated 10% General Fund Reserve allocation: $912,428.57.
$2.053M
Each 22.5% Slice — FY27 Estimate
Education, Parks & Recreation, Infrastructure and Public Facilities each receive the same 22.5% share.

How the One-Cent Tax Is Divided Allocation map — not a spending chart

Reserve 10% Education 22.5% Parks & Recreation 22.5% Infrastructure 22.5% Public Facilities 22.5% INFRASTRUCTURE R.5% $2.053M reference
CURRENT SELECTION
INFRASTRUCTURE — 22.5%
Follow this money: allocation → FY26 actual/YTD activity → FY27 Final use → commitments / restrictions. The detail immediately below changes with this selection.

Infrastructure Detail Follow the money from allocation to final FY27 use

FY26 ACTUAL / YTD FY27 Final DOCUMENTED COMMITMENTS
How to read the colors Money In / Revenue Balance / Existing Funds Money Out / budgeted spending Restricted / Committed Pending / Needs Validation
FY26 PUBLIC ACTUAL / YTD DETAIL — THROUGH JULY 2026
Public June records identify One-Cent Infrastructure transfers to Debt Service, Capital Projects and the Gas Tax Fund.
  • Transfer to Debt Service — YTD through June:$449K
  • Transfer to Capital Projects — YTD through June:$769,188.27
  • Transfer to Gas Tax Fund — YTD through June:$302K
  • FY26 budgeted One-Cent uses:$4.093M
Source basis: City of Prattville public FY26 budget materials and June 2026 unaudited expenditure reporting. “Budgeted,” “transferred,” “paid,” and “outstanding debt” are kept separate rather than treated as interchangeable.
1 · Estimated Money In
$2.053M
FY27 estimated 22.5% allocation based on the Finance Director's final budget review: $2,052,964.29.
FY27 Finance Estimate
2 · The Bucket
22.5%
Dedicated one-cent sales-tax dollars used for roads, drainage, sidewalks, paving, infrastructure projects and related debt.

Accumulated prior-year balance: VERIFY
3 · FY27 Budgeted Money Out
$4.093M
Budgeted uses shown by Finance. This is spending from the designated bucket — not the amount of the annual allocation.
  • McQueen Smith Road - Right of Way — $60.0K
  • McQueen Smith Road - Road Widening — $17.0K
  • ATRIP II - Highway 82 & Highway 31 — $154K
  • TAP (Metropolitan Planning Organization) - Sheila Boulevard, Janice Street, Thames — $56.1K
  • TAP (Alabama Department of Transportation) - Selma Highway, McGriff, Washington Ferry — $200K
  • Metropolitan Planning Organization Carbon Reduction Grant - East Main Street Signals — $364K
  • Industrial Access Road - Bowen Way — $85.0K
  • McQueen Smith Road Metropolitan Planning Organization Paving — $268K
  • Lower Kingston Road / Levee Sidewalks — $131K
  • 113 West Main Culvert Repair — $697K
  • Portion of Wetumpka Street Drainage Project — $662K
  • Gardner Road / Rolling Hills — $4.2K
  • Metropolitan Planning Organization Paving - Sheila Boulevard — $232K
  • Metropolitan Planning Organization Paving - 4th Street — $124K
  • Community Development Block Grant - College Heights Paving — $204K
  • Gas Tax Fund Local Paving — $45.4K
  • Cemetery Paving — $160K
  • Road and Bridge - Industrial Park — $372K
  • 2016 Clean Water State Revolving Fund Debt Service — $24.8K
  • 2017 Clean Water State Revolving Fund Debt Service — $13.4K
  • 2018 Clean Water State Revolving Fund Debt Service — $19.4K
  • 2020 Clean Water State Revolving Fund Debt Service (stormwater) — $89.1K
  • 2021 Clean Water State Revolving Fund Debt Service — $20.2K
  • 2022 Clean Water State Revolving Fund Debt Service (stormwater) — $44.2K
  • 2025 General Obligation Warrants — $47.0K
4 · Commitment / Policy Status
DOCUMENTED DEBT
What is committed, expiring, pending or still needs validation?
  • Debt supported by Infrastructure One-Cent: approximately $4.377M outstanding as of 6/30/2026.
  • Debt and project timing can cause annual use to differ from the current-year 22.5% inflow.
Debt balance source: City of Prattville City-Wide Accounts Payable and Debt Balances, 6/30/2026. Outstanding balance is not the same as the annual debt-service payment.
Debt Service — Level 2 obligation detail Click to see payment, balance, purpose & repayment details

Open an obligation below to see the annual payment, principal/interest where documented, remaining balance where documented, purpose, repayment source and source limitations.

Road & Bridge — Industrial Park — $372K
FY27 Final payment
$372K
Principal
Not separately documented
Interest
Not separately documented
Outstanding principal
Related GO 2019 balance ≈ $1.063M
Balance date
6/30/2026
Repayment source
Infrastructure-related debt service

WHAT DID THIS OBLIGATION SUPPORT?

  • Economic Development / South Industrial Park

WHAT DOES THIS MEAN?

The City debt report separately identifies GO 2019 debt associated with Economic Development / South Industrial Park.

PUBLIC DETAIL ENDS HERE: The reviewed documents do not explicitly establish that the entire $371,765.88 annual Road & Bridge line maps only to the GO 2019 warrant, so the Explorer does not force a one-to-one match.
Do not add these numbers together. The FY27 payment is this year's scheduled debt service. Outstanding principal is the remaining debt balance as of the stated date.
Source basis: FY27 Debt Service Fund / Mayor's Budget and City-Wide Accounts Payable and Debt Balances as of June 30, 2026.
2016 CWSRF — $24.8K
FY27 Final payment
$24.8K
Principal
Not separately documented
Interest
Not separately documented
Repayment source
Infrastructure One-Cent

WHAT DOES THIS MEAN?

Scheduled FY27 Clean Water State Revolving Fund debt service.

Do not add these numbers together. The FY27 payment is this year's scheduled debt service. Outstanding principal is the remaining debt balance as of the stated date.
Source: FY27 Debt Service Fund / Mayor's Budget.
2017 CWSRF — $13.4K
FY27 Final payment
$13.4K
Principal
Not separately documented
Interest
Not separately documented
Repayment source
Infrastructure One-Cent

WHAT DOES THIS MEAN?

Scheduled FY27 Clean Water State Revolving Fund debt service.

Do not add these numbers together. The FY27 payment is this year's scheduled debt service. Outstanding principal is the remaining debt balance as of the stated date.
Source: FY27 Debt Service Fund / Mayor's Budget.
2018 CWSRF — $19.4K
FY27 Final payment
$19.4K
Principal
Not separately documented
Interest
Not separately documented
Repayment source
Infrastructure One-Cent

WHAT DOES THIS MEAN?

Scheduled FY27 Clean Water State Revolving Fund debt service.

Do not add these numbers together. The FY27 payment is this year's scheduled debt service. Outstanding principal is the remaining debt balance as of the stated date.
Source: FY27 Debt Service Fund / Mayor's Budget.
2020 CWSRF — Stormwater — $89.1K
FY27 Final payment
$89.1K
Principal
Not separately documented
Interest
Not separately documented
Repayment source
Infrastructure One-Cent

WHAT DOES THIS MEAN?

Scheduled FY27 CWSRF stormwater debt service.

Do not add these numbers together. The FY27 payment is this year's scheduled debt service. Outstanding principal is the remaining debt balance as of the stated date.
Source: FY27 Debt Service Fund / Mayor's Budget.
2021 CWSRF — $20.2K
FY27 Final payment
$20.2K
Principal
$15.0K
Interest
$5.2K
Repayment source
Infrastructure One-Cent

WHAT DID THIS OBLIGATION SUPPORT?

  • Maple Street drainage

WHAT DOES THIS MEAN?

The detailed FY27 schedule separates this payment into $15,000 principal and $5,225 interest.

Do not add these numbers together. The FY27 payment is this year's scheduled debt service. Outstanding principal is the remaining debt balance as of the stated date.
Source basis: FY27 Debt Service Fund / Mayor's Budget and City debt schedule.
2022 CWSRF — Stormwater — $44.2K
FY27 Final payment
$44.2K
Principal
$31.5K
Interest
$12.7K
Repayment source
Infrastructure One-Cent

WHAT DID THIS OBLIGATION SUPPORT?

  • Thomas Avenue

WHAT DOES THIS MEAN?

The detailed FY27 schedule separates this payment into $31,500 principal and $12,705 interest.

Do not add these numbers together. The FY27 payment is this year's scheduled debt service. Outstanding principal is the remaining debt balance as of the stated date.
Source basis: FY27 Debt Service Fund / Mayor's Budget and City debt schedule.
2025 General Obligation Warrants — Infrastructure share — $47.0K
FY27 Final payment
$47.0K
Principal
Not separately documented
Interest
Not separately documented
Outstanding principal
≈ $14.605M total issue balance
Balance date
6/30/2026
Repayment source
5% Infrastructure share of designated One-Cent repayment structure

WHAT DID THIS OBLIGATION SUPPORT?

  • Projects within the documented 2025 warrant issue

WHAT DOES THIS MEAN?

This is the Infrastructure One-Cent share of the FY27 Final support for the 2025 warrant issue.

Do not add these numbers together. The FY27 payment is this year's scheduled debt service. Outstanding principal is the remaining debt balance as of the stated date.
Source basis: FY27 Debt Service Fund / Mayor's Budget and City-Wide Accounts Payable and Debt Balances as of June 30, 2026.
Capital Projects — show project-level funding detail
Project Funding detail
McQueen Smith Road ROW / Widening Grant support plus Infrastructure / Infrastructure Reserve One-Cent funding, as identified in the Capital Projects budget.
113 West Main Culvert Repair $696,600 — identified as 100% Infrastructure One-Cent.
Wetumpka Street Drainage $661,989.16 Infrastructure One-Cent + $728,115.36 Development Reserves.
Source: FY27 Mayor's Budget, Capital Projects Fund. Mixed funding is shown where the budget identifies more than one source.

What Does This Mean?

The designated percentage determines how One-Cent collections flow into this bucket. Annual spending can be higher or lower than the current-year inflow because money can accumulate from prior years and because projects, debt and other obligations occur on different schedules.

Finance's budget presentation shows $4,092,615 in budgeted Infrastructure One-Cent uses. Annual spending can exceed the current-year 22.5% inflow when prior-year designated balances are also used.
Additional Commitment / Reference Item Amount / Status
General Fund One-Cent Infrastructure → Capital Projects $2,693,143.16
General Fund One-Cent Infrastructure → Gas Tax / road work $769,188.27
General Fund One-Cent Infrastructure → Debt Service $629,983.32
Important: The four designated areas each receive the same 22.5% share, while 10% is directed to General Fund Reserves. Finance Director FY27 estimate: $9,124,285.71 total, $912,428.57 to reserves, and $2,052,964.29 to each 22.5% designated area.

Allocation is not the same as annual spending.

The percentage determines how current One-Cent collections flow into each designated bucket. A bucket may also contain money accumulated from prior years, and debt or project schedules can cause annual spending to be higher or lower than the current-year inflow.

FY26 → FY27 One-Cent Budgeted Use Same designated buckets, year-over-year context

Designated Area FY26 Budgeted Use FY27 Final Use $ Change % Change
Parks & Recreation $2.799M $2.008M −$792K −28.3%
Education $1.982M $1.707M −$275K −13.9%
Infrastructure $3.624M $4.092M +$468K +12.9%
Public Facilities $3.719M $301K −$3.418M −91.9%
Why aren't these amounts equal to the 22.5% annual allocation? The allocation determines how current One-Cent collections flow into each designated bucket. Budgeted use can be higher or lower because designated balances can carry forward from prior years and because projects, debt service and commitments occur on different schedules.
FY26 baseline: City of Prattville FY2026 public budget presentation, “Use of One Cent Funds.” FY27 figures shown here reflect the adopted Final FY2027 budget. Education-specific figures remain under validation where noted.
Final FY27 Infrastructure One-Cent transfers: $2,693,143.16 to Capital Projects, $769,188.27 to Gas Tax, and $629,983.32 to Debt Service. Receiving-fund entries are the same dollars and are not additional City revenue.

One-Cent Sales Tax

See how the penny is allocated, then select a designated area to follow the money from estimated annual allocation to the bucket, budgeted spending and current commitment status.

How to read the colors Money In / Revenue Balance / Existing Funds Money Out / budgeted spending Restricted / Committed Pending / Needs Validation
$9.124M
Reference Annual One-Cent Revenue
Finance Director FY27 estimate: $9,124,285.71 total One-Cent revenue.
FY27 FINANCE ESTIMATE
$912.4K
10% Reserve — FY27 Estimate
FY27 estimated 10% General Fund Reserve allocation: $912,428.57.
$2.053M
Each 22.5% Slice — FY27 Estimate
Education, Parks & Recreation, Infrastructure and Public Facilities each receive the same 22.5% share.

How the One-Cent Tax Is Divided Allocation map — not a spending chart

Reserve 10% Education 22.5% Parks & Recreation 22.5% Infrastructure 22.5% Public Facilities 22.5% PUBLIC FACILITIES R.5% $2.053M reference
CURRENT SELECTION
PUBLIC FACILITIES — 22.5%
Follow this money: allocation → FY26 actual/YTD activity → FY27 Final use → commitments / restrictions. The detail immediately below changes with this selection.

Public Facilities Detail Follow the money from allocation to final FY27 use

FY26 ACTUAL / YTD FY27 Final DOCUMENTED COMMITMENTS
How to read the colors Money In / Revenue Balance / Existing Funds Money Out / budgeted spending Restricted / Committed Pending / Needs Validation
FY26 PUBLIC ACTUAL / YTD DETAIL — THROUGH JULY 2026
Public June records identify One-Cent Public Facilities transfers to Debt Service and Capital Projects.
  • Transfer to Debt Service — YTD through June:$486K
  • Transfer to Capital Projects — YTD through June:$1.627M
  • FY26 budgeted One-Cent uses:$601K
Source basis: City of Prattville public FY26 budget materials and June 2026 unaudited expenditure reporting. “Budgeted,” “transferred,” “paid,” and “outstanding debt” are kept separate rather than treated as interchangeable.
1 · Estimated Money In
$2.053M
FY27 estimated 22.5% allocation based on the Finance Director's final budget review: $2,052,964.29.
FY27 Finance Estimate
2 · The Bucket
22.5%
Dedicated one-cent sales-tax dollars used for public facilities, maintenance, improvements and related debt.

Accumulated prior-year balance: VERIFY
3 · FY27 Budgeted Money Out
$601K
Budgeted uses shown by Finance. This is spending from the designated bucket — not the amount of the annual allocation.
  • 2025 General Obligation Warrants — $300,785.20
  • Public Works Lot Improvements — $100K
  • Facilities Maintenance - HVAC Maintenance Project — $200K
4 · Commitment / Policy Status
DOCUMENTED DEBT
What is committed, expiring, pending or still needs validation?
  • Debt supported by Public Facilities One-Cent: approximately $3.651M outstanding as of 6/30/2026.
  • The GO 2025 Warrants report identifies a 25% Public Facilities / 70% Parks & Recreation / 5% Infrastructure One-Cent repayment structure.
Debt balance source: City of Prattville City-Wide Accounts Payable and Debt Balances, 6/30/2026. Outstanding balance is not the same as the annual debt-service payment.
Debt Service — Level 2 obligation detail Click to see payment, balance, purpose & repayment details

Open an obligation below to see the annual payment, principal/interest where documented, remaining balance where documented, purpose, repayment source and source limitations.

2025 General Obligation Warrants — Public Facilities share — $300,785.20
FY27 Final payment
$300,785.20
Principal
Not separately documented
Interest
Not separately documented
Outstanding principal
≈ $14.605M total issue balance
Balance date
6/30/2026
Repayment source
25% Public Facilities share of designated One-Cent repayment structure

WHAT DID THIS OBLIGATION SUPPORT?

  • City Hall Annex renovations
  • Public Safety Training Facility
  • Other projects financed within the documented 2025 warrant issue

WHAT DOES THIS MEAN?

This is the Public Facilities One-Cent share of the FY27 scheduled support for the 2025 warrant issue.

Do not add these numbers together. The FY27 payment is this year's scheduled debt service. Outstanding principal is the remaining debt balance as of the stated date.
Source basis: FY27 Debt Service Fund / Mayor's Budget and City-Wide Accounts Payable and Debt Balances as of June 30, 2026.

What Does This Mean?

The designated percentage determines how One-Cent collections flow into this bucket. Annual spending can be higher or lower than the current-year inflow because money can accumulate from prior years and because projects, debt and other obligations occur on different schedules.

Finance's budget presentation shows $600,785 in budgeted Public Facilities One-Cent uses. This is spending from the designated bucket, not the amount of the annual 22.5% allocation itself.
Additional Commitment / Reference Item Amount / Status
General Fund One-Cent Public Facilities → Debt Service $300,785.20
Important: The four designated areas each receive the same 22.5% share, while 10% is directed to General Fund Reserves. Finance Director FY27 estimate: $9,124,285.71 total, $912,428.57 to reserves, and $2,052,964.29 to each 22.5% designated area.

Allocation is not the same as annual spending.

The percentage determines how current One-Cent collections flow into each designated bucket. A bucket may also contain money accumulated from prior years, and debt or project schedules can cause annual spending to be higher or lower than the current-year inflow.

FY26 → FY27 One-Cent Budgeted Use Same designated buckets, year-over-year context

Designated Area FY26 Budgeted Use FY27 Final Use $ Change % Change
Parks & Recreation $2.799M $2.008M −$792K −28.3%
Education $1.982M $1.707M −$275K −13.9%
Infrastructure $3.624M $4.092M +$468K +12.9%
Public Facilities $3.719M $300,785.20 −$3.418M −91.9%
Why aren't these amounts equal to the 22.5% annual allocation? The allocation determines how current One-Cent collections flow into each designated bucket. Budgeted use can be higher or lower because designated balances can carry forward from prior years and because projects, debt service and commitments occur on different schedules.
FY26 baseline: City of Prattville FY2026 public budget presentation, “Use of One Cent Funds.” FY27 figures shown here reflect the adopted Final FY2027 budget. Education-specific figures remain under validation where noted.
Final FY27 Public Facilities One-Cent transfer to Debt Service: $300,785.20. The Debt Service receiving entry is the same transfer, not additional City revenue.

One-Cent Sales Tax

See how the penny is allocated, then select a designated area to follow the money from estimated annual allocation to the bucket, budgeted spending and current commitment status.

How to read the colors Money In / Revenue Balance / Existing Funds Money Out / budgeted spending Restricted / Committed Pending / Needs Validation
$9.124M
Reference Annual One-Cent Revenue
Finance Director FY27 estimate: $9,124,285.71 total One-Cent revenue.
FY27 FINANCE ESTIMATE
$912.4K
10% Reserve — FY27 Estimate
FY27 estimated 10% General Fund Reserve allocation: $912,428.57.
$2.053M
Each 22.5% Slice — FY27 Estimate
Education, Parks & Recreation, Infrastructure and Public Facilities each receive the same 22.5% share.

How the One-Cent Tax Is Divided Allocation map — not a spending chart

Reserve 10% Education 22.5% Parks & Recreation 22.5% Infrastructure 22.5% Public Facilities 22.5% RESERVE H% $912.4K reference
CURRENT SELECTION
10% RESERVE — 10%
Follow this money: allocation → FY26 actual/YTD activity → FY27 Final use → commitments / restrictions. The detail immediately below changes with this selection.

10% Reserve Detail Follow the money from allocation to final FY27 use

FY26 ACTUAL / YTD FY27 Final DOCUMENTED COMMITMENTS
How to read the colors Money In / Revenue Balance / Existing Funds Money Out / budgeted spending Restricted / Committed Pending / Needs Validation
FY26 PUBLIC ACTUAL / YTD DETAIL — THROUGH JULY 2026
The public FY26 materials establish the 10% allocation structure, but the July public expenditure report reviewed does not isolate a single YTD '10% Reserve spent' line.
  • FY27 estimated allocation:$912.4K
  • June YTD reserve-specific expenditure total: NOT SEPARATELY IDENTIFIED
  • Why: Reserve activity should not be inferred from unrelated General Fund expenditures or transfers.
Source basis: City of Prattville public FY26 budget materials and June 2026 unaudited expenditure reporting. “Budgeted,” “transferred,” “paid,” and “outstanding debt” are kept separate rather than treated as interchangeable.
1 · Estimated Money In
$912.4K
FY27 estimated 10% General Fund Reserve allocation based on the Finance Director's final budget review: $912,428.57.
FY27 Finance Estimate
2 · The Bucket
10%
Ordinance-level allocation to be displayed here once the exact current-year amount and reserve status are verified in the budget materials.

Accumulated prior-year balance: VERIFY
3 · FY27 Budgeted Money Out
VERIFY
Budgeted uses shown by Finance. This is spending from the designated bucket — not the amount of the annual allocation.
  • Current-year amount and use — VERIFY
4 · Commitment / Policy Status
PUBLIC DETAIL ENDS
What is committed, expiring, pending or still needs validation?
  • Review current projects, debt obligations and accumulated designated balance for this slice.
Why no reserve-specific YTD spending total?

The July public expenditure report does not separately isolate a single YTD expenditure line for the 10% Reserve designation. The Explorer therefore does not infer a reserve spending total from unrelated transfers or General Fund activity.

Status: public detail limited / additional Finance verification required.

What Does This Mean?

The designated percentage determines how One-Cent collections flow into this bucket. Annual spending can be higher or lower than the current-year inflow because money can accumulate from prior years and because projects, debt and other obligations occur on different schedules.

This section remains marked VERIFY in the portal until the current budget documents establish the exact dollar amount and destination for the 10% allocation.
Additional Commitment / Reference Item Amount / Status
Fiscal Year 2027 amount and destination VERIFY
Important: The four designated areas each receive the same 22.5% share, while 10% is directed to General Fund Reserves. Finance Director FY27 estimate: $9,124,285.71 total, $912,428.57 to reserves, and $2,052,964.29 to each 22.5% designated area.

Allocation is not the same as annual spending.

The percentage determines how current One-Cent collections flow into each designated bucket. A bucket may also contain money accumulated from prior years, and debt or project schedules can cause annual spending to be higher or lower than the current-year inflow.

FY26 → FY27 One-Cent Budgeted Use Same designated buckets, year-over-year context

Designated Area FY26 Budgeted Use FY27 Final Use $ Change % Change
Parks & Recreation $2.799M $2.008M −$792K −28.3%
Education $1.982M $1.707M −$275K −13.9%
Infrastructure $3.624M $4.092M +$468K +12.9%
Public Facilities $3.719M $301K −$3.418M −91.9%
Why aren't these amounts equal to the 22.5% annual allocation? The allocation determines how current One-Cent collections flow into each designated bucket. Budgeted use can be higher or lower because designated balances can carry forward from prior years and because projects, debt service and commitments occur on different schedules.
FY26 baseline: City of Prattville FY2026 public budget presentation, “Use of One Cent Funds.” FY27 figures shown here reflect the adopted Final FY2027 budget. Education-specific figures remain under validation where noted.

Community Initiatives & Partner Agencies

Grouped by service need, type and public benefit so the Council and public can understand both the accounting structure and the community purpose behind the funding.

FINAL FY27 BUDGET: Amounts in this section have been reset to the final FY27 budget where validated by the Finance package.
How to read the colors Money In / Revenue Balance / Existing Funds Money Out / budgeted spending Restricted / Committed Pending / Needs Validation
$1,917,950.50
Community Initiatives
Separate final FY27 department total.
$557,000
City-County Services
Health Department $12K · Humane Society $135K · Library $410K.
Separate
Keep the Accounting Areas Distinct
City-County Services is not part of the Community Initiatives total.
How to read this: Finance carries these appropriations in separate accounting areas. This portal identifies the accounting home for each item so Community Initiatives and City-County Services are not combined.
Accounting rule: PAHS/Humane Society is $135,000 under City-County Services, not Community Initiatives. City-County Services totals $557,000; Community Initiatives is a separate $1,917,950.50 department.

Community Investment Review Prior year → request → final amount → status

Essential & Public Service Partners

Direct services addressing identifiable community needs.

12 organizations / lines
Organization Fiscal Year 2026 Approved Fiscal Year 2027 Request Fiscal Year 2027 final FY27 Funding Status
Prattville/Autauga Humane Society City / County Agency $120K $135K $135K FUNDED FY27
Autauga-Prattville Public Library City / County Agency $410K $410K $410K FUNDED FY27
Autauga County Health Department City / County Agency $12.0K — $12.0K FUNDED FY27
Rural Transportation City / County Agency $15.0K — $0 NOT FUNDED FY27
Autauga County EMA $10.0K — $10.0K FUNDED FY27
Autauga County Family Support $2.5K $5.0K $2.5K FUNDED FY27
Family Sunshine Center $2.0K — $2.0K FUNDED FY27
Autauga County Rescue Squad $8.0K — $8.0K FUNDED FY27
R.S.V.P. $6.0K — $6.0K FUNDED FY27
Warming Center $0 — $10.0K FUNDED FY27
Animal Control $5.0K — $20.0K FUNDED FY27
Carastar / Montgomery Area Mental Health $0 — $0 NOT FUNDED FY27

Economic Development, Tourism & Community Assets

Investments that strengthen our economy, business environment, tourism and major community assets.

4 organizations / lines
Organization Fiscal Year 2026 Approved Fiscal Year 2027 Request Fiscal Year 2027 final FY27 Funding Status
Prattville Area Chamber of Commerce $250K $350K $350K FUNDED FY27
Prattville Airport $120K — $120K FUNDED FY27
Historic Prattville Redevelopment Authority $63.0K — $63.0K FUNDED FY27
The Pratt $800K — $1.181M FUNDED FY27
Finance correction: the former Tourism & Economic Development line is not a single FY27 Community Initiatives line. Its funding is distributed among several line items in the Economic Development Department and The Lyric at Esther’s Department.

Heritage, Education & Quality of Life

Programs supporting our history, education, conservation, civic life and overall quality of life.

9 organizations / lines
Organization Fiscal Year 2026 Approved Fiscal Year 2027 Request Fiscal Year 2027 final FY27 Funding Status
Autauga County Heritage Association $50.0K — $75.0K FUNDED FY27
Autauga Creek Improvement Committee $5.0K — $5.0K FUNDED FY27
Autauga County Master Gardeners Association $1.0K — $1.0K FUNDED FY27
Liberty Learning Foundation $0 — $1.0K FUNDED FY27
Character Council / Coalition $2.5K — $2.5K FUNDED FY27
Autauga County Conservation District $10.0K — $10.0K FUNDED FY27
One Community Outreach United
What does this mean?

The FY27 General Fund budget shows $0 on this line. Funding is treated separately through FDR and remains conditional rather than a direct FY27 General Fund appropriation.

$10.0K $0 $0 FDR FUNDED / CONDITIONAL
North Highland Community Center $10.0K — $10.0K FUNDED FY27
L. M. Smith Development Center $20.0K — $20.0K FUNDED FY27

Special Purpose & Community Support

Programs and projects addressing specific community needs or purposes.

4 organizations / lines
Organization Fiscal Year 2026 Approved Fiscal Year 2027 Request Fiscal Year 2027 final FY27 Funding Status
Prattville Solid Waste Authority $3.2K — $3.2K FUNDED FY27
Boy Scout Memorial Movement
What does this mean?

The FY27 General Fund budget shows $0 on this line. Funding is treated separately through FDR and remains conditional rather than a direct FY27 General Fund appropriation.

$10.0K — $0 FDR FUNDED / CONDITIONAL
Aging Consortium $5.0K — $5.0K FUNDED FY27
Oasis of Hope Foundation $0 — $0 NOT FUNDED FY27
Finance correction: Butterfly Bridge and Crime Stoppers are funded at $10,000 each through the Police Department (Misc. Contract Services), so they are not shown as separate Community Initiatives appropriations.

Council Flexibility

Before calling a dollar “available,” first determine what kind of dollar it is.

How to read the colors Money In / Revenue Balance / Existing Funds Money Out / budgeted spending Restricted / Committed Pending / Needs Validation

What Does “Council Flexibility” Mean?

Not every dollar in the City budget can simply be moved somewhere else. Some money is restricted by law or by the way it was collected. Some is already committed to debt, contracts or approved obligations. Some is necessary to keep City services operating. Council flexibility is the portion of the budget where elected officials may actually have choices about how money is used.

RESTRICTED

The money has rules attached to it.
It can only be used for certain purposes. Fee-funded Sanitation and Wastewater accounts are examples.

COMMITTED

The City has already made an obligation.
This can include debt payments, contracts or previously approved commitments.

OPERATIONALLY NECESSARY

The service still has to operate.
Police, Fire, Public Works and other essential operations require funding even when the dollars are technically controlled by the City.

POLICY CHOICE

This is where Council may have a decision.
These expenditures may be changed, reduced, redirected or prioritized differently through the budget process.

NEEDS VERIFICATION

We do not know enough yet.
Finance, legal, contractual or other information is needed before calling the money available or unavailable.

How City Money Works Why the headline balance is not the same as money available for any purpose

The final FY27 budget estimates approximately $65.7 million in General Fund revenue. That is the City's primary operating fund — but it does not mean Council has $65.7 million available for a new priority. The first question is not simply “Do we have the money?” It is “What fund is the money in, and what is that money already expected or required to do?”

$65.702M
FY27 Final GENERAL FUND REVENUE — the starting point for the City's broad operating budget
1 · CORE SERVICES

Run the City

Police, Fire, Public Works, Parks, Courts and administration require people, benefits, fuel, utilities, contracts and daily operating costs.

2 · EXISTING OBLIGATIONS

Honor Commitments

Debt, contracts, transfers and existing commitments can reduce practical flexibility even when the dollars are not legally restricted.

3 · RESTRICTED / DEDICATED

Stay in the Bucket

Some revenues are restricted or dedicated to a particular service or purpose. They cannot simply be treated as General Fund cash for an unrelated priority.

4 · POLICY FLEXIBILITY

Council Choices

After core services, legal restrictions and existing commitments are understood, Council can identify where genuine policy choices and tradeoffs remain.

A large balance does not mean all of that money is available for any purpose.
1. What fund is the money in?
2. Is it restricted, committed or operationally necessary?
3. If not, is using it here a Council policy choice?
GENERAL FUND The broad operating fund. This is where the City generally has its greatest policy flexibility — after core services and commitments are considered.
ONE-CENT / GAS TAX / DEDICATED FUNDS Money assigned or restricted to defined purposes. The correct question is whether the budgeted use fits the designated bucket.
SANITATION / WASTEWATER Service or enterprise-type funds supported by charges for those services. Their revenues and expenses should be evaluated within those operations.

Why It Matters A bank balance is not the same thing as spendable cash

A large balance does not mean the City has that much money available for a new priority. Before Council considers moving money, we need to know: Can it legally be moved? Is it already promised? Is it needed to operate a City service? Or is it truly a policy choice?
$1 in the Budget Start with the dollar, not the headline balance.
Restricted? If yes, keep it with its legally or operationally designated purpose.
Committed? If yes, protect the existing obligation.
Needed for Operations? If yes, protect the service requirement.
None of Those? Now it may be a potential Council policy choice.

Working Classification of Budget Lines Use Finance and legal review to move items from “Verify” to a final classification.

Budget Area / Line Amount Working Classification Why It Matters
Group Health transfer $4.498M COMMITTED Existing obligation
Judicial Fund transfer $384K OPERATIONALLY NECESSARY NEEDS VERIFICATION
Gas Tax - One-Cent Infrastructure $769,188.27 RESTRICTED RESTRICTED / dedicated
Debt Service - One-Cent Infrastructure $629,983.32 RESTRICTED RESTRICTED / dedicated
Debt Service - One-Cent Parks & Rec $1,524,855.89 RESTRICTED RESTRICTED / dedicated
Debt Service - One-Cent Public Facilities $300,785.20 RESTRICTED RESTRICTED / dedicated
Striplin Business Center transfer $906K Split / Documented Existing obligation
Community Initiatives $1.918M POLICY CHOICE Council POLICY CHOICE
City / County Agencies $557K POLICY CHOICE Council POLICY CHOICE
Budget Explorer is integrated directly into this page using Indigo-safe HTML/CSS controls.

 This is not a separate City budget. It is an independent educational and explanatory tool prepared by Councilor Wade Newman using City budget documents and Finance Department information.

Historical figures, reference calculations, estimates and items still awaiting confirmation are identified as such. Budget information may change during the budget process. Official City of Prattville budget and financial documents remain the controlling source.